Secondary cooling circuits
Coordinate defined non-product-contact water-side connections.
Pharmaceutical facilities / non-product-contact utilities
Plan non-product-contact cooling and building utilities with clear engineering, quality and equipment interfaces.
Application guide · design inputs
Application analysis
Classify each proposed service with the site’s engineering and quality teams. Record product-contact status, utility criticality and the boundary to validated process systems in the user-requirement specification.
For non-product-contact utilities, coordinate equipment connections, isolation and distribution routes. Record fluid and cleaning conditions, materials, seals, traceability and inspection/testing requirements. Include installation and handover responsibilities within the site’s change-control process.
Coordinate defined non-product-contact water-side connections.
Prepare traceable equipment interfaces for facilities services.
Agree the utility/process demarcation with engineering and QA.
Concept arrangement / 14
Select a review point to inspect the source, controls and distribution of a representative utility module.
Utility plant — Identify a defined non-product-contact source.
Engineering review
| Design input | What it changes | Evidence to request |
|---|---|---|
| Criticality | Classify the service and any product-quality impact. | Engineering/QA-approved utility and process boundaries. |
| Water/service grade | Separate ordinary utilities from validated process services. | Site user-requirement specification and acceptance criteria. |
| Materials & seals | Review the exact fluid and cleaning environment. | Part-specific compatibility and documentation needs. |
| Change control | Align installation and handover with the site process. | Inspection, testing and change-control responsibilities. |
Part-number starting points
Review catalogue dimensions, materials and connection types alongside the service schedule. Add selected part numbers to your enquiry.
Specify the size, pipe outside diameter, material, seal, joining system and tool. Include the intended duty and required product acceptance documents with the enquiry.
Prepare the next conversation
Questions worth resolving
Defined non-product-contact building utilities and secondary cooling circuits with documented site requirements.
The site’s engineering, process and quality teams record the classification and acceptance requirements in the project specification.
List the required material/component records, inspection and test documents, change-control records and site qualification interfaces.
Connected applications