Secondary cooling water
Review a defined utility circuit separated from process fluids.
Process facilities / utility-side scope
Plan secondary water and cooling services around a documented fluid specification and a clear process-equipment interface.
Application guide · design inputs
Application analysis
Prepare a service-by-service fluid schedule with composition, concentration, contaminants and operating/design conditions. Identify process streams separately from secondary cooling water and general equipment utilities.
Mark the heat-exchanger or process-package boundary on the drawings. Review wetted materials, seals, joining methods, containment, isolation and inspection requirements for the documented duty. Record material compatibility and the project design basis in the component schedule.
Review a defined utility circuit separated from process fluids.
Resolve the utility-side interfaces of a process skid.
Build a traceable service and document schedule before selection.
Concept arrangement / 12
Select a review point to inspect the source, controls and distribution of a representative utility module.
Utility source — The example represents a specified secondary utility.
Engineering review
| Design input | What it changes | Evidence to request |
|---|---|---|
| Fluid definition | Identify the actual chemical and exposure conditions. | Composition, concentration, contaminants and safety information. |
| Corrosion compatibility | Assess all wetted materials and seals. | Competent material review and compatibility evidence. |
| Design basis | Apply the project’s piping code and service category. | Design conditions, component specification and examination plan. |
| Containment boundary | Keep process and utility responsibilities explicit. | Equipment diagrams, isolation and maintenance requirements. |
Part-number starting points
Review catalogue dimensions, materials and connection types alongside the service schedule. Add selected part numbers to your enquiry.
Specify the size, pipe outside diameter, material, seal, joining system and tool. Include the intended duty and required product acceptance documents with the enquiry.
Prepare the next conversation
Questions worth resolving
Use the fluid composition, concentration, contaminants, temperature and exposure conditions to assess all wetted materials and seals.
Mark it at the heat exchanger or process package and identify the fluid and design conditions on each side.
Include the fluid specification, material/seal assessment, design conditions and the required inspection, testing and product acceptance records.